Performance Period: 2010
To establish a performance and cost baseline for a typical hydraulic powertrain in a wave energy conversion device, RE Vision was tasked to conceptualize a 100kW power module that could be used as a benchmark for WEC design efforts. The scope included a selection of off-the shelf components, cost assessment, quantification of losses in the powertrain, an assessment of maintenance cycles and an assessment of failure events.